Project Description
This project was a one-storey, structural steel building clad with insulated metal siding and aluminum windows. Acting as construction managers, PCL and the mechanical/electrical designers provided budgets. Structural, architectural and site development work came well within our budget, however mechanical and electrical work exceeded budgets dramatically. Value engineering reduced mechanical and electrical costs to a point where total costs for the project were less than budgeted.
The project completion date was fixed at May 24, 1996, however the start was delayed from November 1995 to February 1996 and mechanical and electrical contracts were not finalized until the end of March. The challenge for completion of work (mechanical, electrical and finishes) in eight weeks was achieved by careful site planning and expediting of materials.
|
Contact
For similar projects contact:OwnerPrime ConsultantPye & Richards Architects Inc.
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |