www.pcl.com
HomeCareersWatch Us BuildLocationsContact Us

New Terminal Development - Toronto International Airport

Completed aerial

Location:

Mississauga, ON

Built By:

PCL/Aecon, A Joint Venture
Project Description

The PCL/Aecon Joint Venture has now completed their role as Construction Manager for the New Terminal Development at Toronto's Lester B. Pearson International Airport. Pier F's opening marks the end of the 8-year Airport Development Program undertaken by the GTAA. In redeveloping the airport, the GTAA has introduced a new runway, taxiways, utilities, roads, bridges, an on-airport train system, upgrades to Terminal 3 and the introduction of the new Terminal 1, which opened in 2004.

The new international Pier F is home to 25 gates and increases the passenger capacity of the airport by seven million passengers. The airport is now in the position to handle 38 million passengers per year.

 

Contact

For similar projects contact:

Owner

Prime Consultant

Airport Architects Inc.