|
|
|
|
|||||||||||||||||||||||
Project Description
Removal of the existing deck, structural steel reinforcing and replacement of the concrete deck. Roadworks on both sides of the bridge. Westbound lanes were operational during constuction and FRP reinforcing was used in one span.
|
Contact
For similar projects contact:OwnerManitoba Infrastructure and Government Services
Prime Consultant |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |