Current Progress
(as of July/08): Finishes in the Building M suites are complete, with the exception of the hoist suites. PPDI inspections have been completed up to the 12th floor and suites have been certified up to the 9th floor. Corridor finishes are on-going. At Tower L, concrete, structural steel and window wall activities are complete, while roofing and siding activities are on-going. On the interior, suite framing is complete and drywall boarding has reached the penthouse level. Kitchen installation is on the 39th floor with the countertops following on the 37th floor. Laminate flooring is being completed on the 35th floor, carpet on the 33rd floor and closet shelving and sliding doors are on the 30th floor. PPDI inspections began in late June. Curtainwall and roofing at the Amenity Building are complete and interior finishes are on-going. Project Description
This project consists of the construction of a 47-storey tower; 16-storey mid-rise building, a 2-storey amenity space and retail space. The buildings will be on a 3-level underground parking garage. When complete, the complex will consist of 885 condominium units and 939 parking spaces, for a total combined GFA of approximately 1.1 million square feet.
|
Contact
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |