Current Progress
We continued in June with concrete structure work, GWB framing, masonry, mechanical and electrical work on site. We completed core concrete work up to the 3rd floor and stair #2 shaft up to the 5th floor. Mechanical and electrical trades are roughing-in services in the basement and working on the connection of services to HSC existing systems. We are proceeding with structural steel erection for the main floor roof. We plan to complete main floor roof before rigging of the Cyclotron scheduled to start on August 25, 2008. Stair #2 (east) concrete shaft will be completed in mid July to allow us to start structural steel framing of level 3. Completion of the structure concrete work is scheduled for end of August. Project Description
The Siemens Institute for Advanced Medicine (SIAM) facility at Health Sciences Centre for Winnipeg Regional Health Authority is a new 8,420 m2, 6 floors research building. Building will feature state-of-the-art medical research laboratories with Cyclotron suite, Linear Accelerator Suite and real time MRI. SIAM will be a centre for innovative medical technologies in Manitoba and Canada. The building is connected to the existing buildings at the Basement and Main and 2nd Floor. The key features of the new building include the following:
Building foundation, Main floor framing, 2nd Floor framing and cores of the remaining floors are structural concrete with balance of the structure with Structural Steel. Floors are concrete on metal deck. Construction started in April 2007 and is scheduled for completion in March 2009.
|
Contact
Contact ProjectPhone: (204) 786-3287
Fax: (204) 786-3324
OwnerWinnipeg Regional Health Authority
Prime ConsultantSmith Carter Architects and Engineers Incorporated
|