Project Description
Saw Cut, remove and re-install concrete and embedded metals. These include the access ladder, draft tube liner, stay vanes, and staor ring frame. Re-installation includes layout, anchorage, grouting and/or form and place concrete. The contract includes seven turbine generator units, each requiring a six month shut down to refurbish with a two month break between shut downs.
|